ESG insights
EUDR in November 2026: making year-end preparation concrete
Ahead of the next EUDR application date, businesses should finalise scope and data-process checks. Product, role, size and the applicable transition are decisive.
Climate targets in 2026: commitments that remain relevant after Omnibus
Removal of a particular statutory planning duty does not make every climate commitment legally irrelevant. Contracts, advertising and governance require separate assessment.
Environmental advertising from September 2026: claims, labels and existing stock
New sustainability advertising rules change product and campaign approval. Businesses need a specific assessment of each claim and its use.
PPWR from August 2026: allocating packaging duties by role and date
General application of the PPWR makes precise allocation of duties particularly important. Requirements do not all begin simultaneously, and different roles carry different responsibilities.
ESG procurement in 2026: preparing remedies before contract award
Sustainability criteria can determine a tender’s outcome. Challenging their design or evaluation requires coordination of substantive arguments and procedural deadlines.
EPBD in 2026: what the transposition deadline means for property decisions
The European implementation deadline prompts renewed review of long-term property projects. It does not mean an identical immediate renovation duty for every asset.
Repair rights in 2026: aligning service contracts and product processes
European repair rules connect sustainability with specific consumer and manufacturer obligations. Businesses must distinguish seller liability, separate repair duties and technical product rules.
CSDDD in 2026: narrower scope, a new timetable and targeted due diligence
Reform changes both timing and the reach and design of European due diligence. Existing supply chain projects therefore need a targeted reassessment.
CSRD reform in 2026: assessing reporting duties under the new thresholds
The final Omnibus reform substantially changes regular reporting scope. Fresh assessment depends on entity, group, financial year and national implementation.
CBAM in 2026: moving from transitional reporting to the definitive system
Since the start of 2026, CBAM can no longer be treated solely as a historical reporting project. Import planning, authorisation and emissions information must be coordinated.
