Biodiversity becomes a legal project risk where land, water, species or ecological functions are affected. We connect nature conservation authorisation, corporate risk assessment and substantiated claims about a project’s contribution to nature.
Distinguishing the requirements
The EU Nature Restoration Regulation primarily directs planning duties and targets at Member States. It does not impose a blanket obligation on every business to restore a specified share of its land. For individual projects, impact mitigation, species and habitat protection, water law, land-use planning and existing permits remain particularly important. National restoration plans specify state implementation; drafts and final measures must not be equated.
Businesses should assess site and supply chain risks separately: a production site may face water scarcity while its raw materials originate in ecologically sensitive areas. Voluntary frameworks such as TNFD can structure analysis. They replace neither permits nor assessment of binding reporting or contractual duties.
Preparing projects and contracts
Before investment, an inventory of land, protected areas, use rights and regulatory requirements is advisable. Expert reports must match the proposed intervention; outdated surveys or averages alone may weaken the decision base. Compensation measures need rules on availability, duration, maintenance, evidence and succession. Land purchases should disclose who bears obligations already incurred.
Climate adaptation also concerns heavy rainfall, heat, drought and business interruption. We assess how technical findings translate into supply agreements, leases, insurance and investment decisions. “Nature-positive” promises need a clear reference and verifiable evidence; one greening measure does not demonstrate an overall positive nature balance.
Proceedings and legal protection
Investigation scope, participation and conditions are clarified early in permitting. Adverse decisions may permit objections and administrative litigation under the relevant legislation; immediate enforcement requires additional assessment of interim protection. Associations and neighbours have distinct standing conditions. Contract disputes over compensation land, maintenance or warranties generally follow the agreed civil dispute route.
Preparation includes preserving permits, surveys, reports, land agreements and service dates. Our pages on administrative proceedings and interim relief explain the instruments. Nature-related advertising is also addressed under greenwashing.
Four practical examples
The following examples are illustrative scenarios, not accounts of completed client matters.
Example 1: Expansion beside a protected area
A manufacturer plans a new building. Proximity to a protected area prompts impact assessment before construction and investment contracts become binding. Expert instructions, location alternatives and permitting risks are coordinated. A refusal leads to assessment of whether further studies or judicial protection can advance the project.
Example 2: Compensation land is sold
A business acquires land already committed to ecological compensation. The agreement must address existing duties, maintenance costs and regulatory safeguards. A general seller statement does not replace examination of decisions and property encumbrances.
Example 3: Water abstraction is restricted
During drought, an authority restricts a plant’s water abstraction. Competence and reasons are assessed alongside supply and environmental consequences. An interim application is prepared with technical alternatives and reliable consumption data, while delivery commitments are adjusted in parallel.
Example 4: Advertising “nature-positive production”
A business bases the claim on an afforestation project. Assessment separates the project’s effects, the business’s own impacts and the claim’s scope. Where evidence is inadequate, communications and contracts are corrected before injunction or liability disputes arise.
Legal sources and further reading
Legal position: 15 November 2026. General information does not replace an assessment of the individual case. Deadlines, transitional provisions, admissibility and representation requirements must be checked against the particular decision and procedural circumstances.
Related topics
Contact
Your next step in ESG law.
Whether your matter concerns contracts, regulatory proceedings or a dispute, tell us what you need. We will clarify the legal issues and next steps with you.
horak Rechtsanwälte Partnerschaft mbB · Georgstraße 48 · 30159 Hannover